The question "when should we bring a fire safety consultant into the project?" comes up in every initial briefing. The right answer determines not just cost — but the feasibility of the entire solution.

The Question Architects Ask — and Why the Answer Matters More Than It Seems

At a new project kick-off meeting, the agenda is packed: architect, structural engineer, electrical consultant, HVAC consultant. Fire safety? "We'll bring that in when we get to the permitting phase."

That is the moment the problem begins. Not out of bad intentions — but because most professionals have never seen what happens on the other side of the Authority's table. There, a file that arrives without early fire safety coordination is recognized immediately: the enclosures don't match the detector layout, the evacuation stairwell is narrower than permitted, and the compressor room was sealed with a solution that has to be reopened.

When to bring a fire safety consultant into a project is not a technical question. It is a risk management question.

Three Project Phases — and What a Fire Safety Consultant Does in Each

Phase A — Recommended

Initial Design

Evacuation core placement, travel distances, fire compartment zoning — all defined while they are still on paper. The building is designed around fire safety, not the other way around.

Phase B — Possible

Permitting Phase

Corrections are still possible — but many solutions are already locked in. The consultant coordinates with the Israel Fire and Rescue Authority, identifies gaps, and assists in completing the submission documents. Changes at this stage may require drawing revisions.

Phase C — Complex

Construction Phase

The consultant coordinates system contractors (suppression, alarm, pressurization), verifies that construction matches approved drawings, and oversees the final inspection. Every change at this point is real field work.

The three phases are not equal. A consultant's value is not uniform across the project — it diminishes as drawings turn into concrete.

What Happens When the Consultant Comes In Early

Early engagement allows the building to be designed so that fire safety is not an added layer — it is part of the layer. Several things happen:

Early Engagement — What You Gain

  • Evacuation core routes designed correctly from the start
  • No surprises at the Israel Fire and Rescue Authority submission
  • Suppression and alarm systems integrated into the overall design
  • Early coordination accelerates approvals
  • Changes are inexpensive because they are still on paper

Late Engagement — What You Pay

  • Redesign of evacuation routes already finalized
  • System contractors entering an unprepared site
  • Resubmissions to the Israel Fire and Rescue Authority
  • Compressed solutions: systems forced into spaces never designed for them
  • Delays to the overall project timeline
Field Case — Netivot Project 301

Two Towers Over 42 Meters — Early Engagement

In a residential project in Netivot comprising two towers exceeding 42 meters in height, Saar Udi's fire safety consulting was integrated from the initial design phase. The result: Israel Fire and Rescue Authority approval within two months. Not by luck — because the file arrived complete, coordinated, and free of contradictions requiring resolution.

"I come in at the stage when it is still possible to design the building around fire safety — not to compress it inside afterwards."
— Saar Udi, Senior Fire Safety Consultant

What Happens When the Consultant Comes In Late

Construction is a process of cumulative decisions. Each decision that is locked in narrows the space for the next change. When a fire safety consultant arrives after drawings have been submitted, he finds himself not designing — but correcting.

A project that arrives at the Israel Fire and Rescue Authority without early coordination is often caught on the most basic questions: where is the wet riser? How is the sprinkler coordinated with the concrete beams? Who approved the paint store location?

Every unanswered question carries a cost — in time, in resubmission, and sometimes in a physical change that has already been cast into the wall.

Field Case — Caesarea Gypsum Plant

Industrial Facility — Full Lifecycle Consulting

The Caesarea gypsum manufacturing plant is an example of a project where fire safety systems cannot be separated from the industrial process. Consulting spanned four years of the project (2022–2026) — design, approvals, construction, and inter-system integration. When complexity is high, there is no "alternative entry point" — engagement must be continuous.

Lessons from the Field: What I Saw from the Authority's Side

Seven years working in the Fire Protection Division of the Israel Fire and Rescue Authority — in an inspection and enforcement role reviewing building permit applications — provide a perspective that is difficult to acquire any other way.

The projects that were delayed were not always the bad projects. Sometimes they were large, complex, and expensive — but entered the Authority's process without anyone sitting down beforehand to coordinate requirements. So they came back again and again with questions that could have been resolved in three conversations during the design phase.

I saw files that came back six times. I saw buildings constructed without the correct vertical shaft for the suppression pipe. I saw evacuation staircases running through rooms added during construction. None of this was negligence — it was the product of a project that did not include the right people at the right time.

"The great moments are not the fire that happened. They are the fire that didn't."
— Saar Udi

My architectural background adds a dimension: when I look at a plan, I see space — not just equipment. I understand where the occupant walks, what they see, where they run under stress. That changed the way I give advice — from checklists of requirements to spatial solutions that actually work.

Frequently Asked Questions

When should a fire safety consultant be brought into a construction project?
The earlier, the better. The ideal entry point is the initial design phase, before architectural solutions have been finalized. At this stage, fire safety requirements can be integrated into the structure itself without requiring costly changes to already-planned layouts. The later the consultant enters, the more expensive and complex the solutions become to implement.
Is a fire safety consultant only required for large buildings?
No. Fire safety requirements apply to a wide range of projects — from residential buildings to public facilities, factories, warehouses, and commercial premises. The need for a consultant is determined by occupancy type, height, occupant density, building classification, and system complexity — not solely by total floor area. Projects with flammable materials, high occupant concentration, or complex structures require dedicated consulting regardless of size.
What is the difference between engaging a consultant at the design stage versus the permitting stage?
At the design stage, the building can be shaped around fire safety — establishing core room placement, evacuation routes, openings, and equipment rooms so that systems integrate organically. At the permitting stage, many of those decisions are already locked in, and correction often requires drawing revisions and rework. At the construction stage, every change is physical field work that can delay the schedule and increase project cost.
Does a fire safety consultant shorten the building permit process?
Yes — when engaged early and preparing a coordinated, organized submission package aligned with Israel Fire and Rescue Authority requirements. A complete file, free of contradictions, with reasoned solutions, moves through faster. In contrast, a file requiring corrections comes back each time with additional wait time. Years of experience on the Authority's side make it possible to anticipate what will be asked and what will be required — and to prepare the answers in advance.
How much does a fire safety consultant cost and what does the service include?
Cost varies by project type, size, and engagement phase. The service typically includes: design advisory and requirements specification, coordination with the Israel Fire and Rescue Authority, fire suppression and alarm system specification, and coordination with the project's other consultants. Complex projects also include ongoing oversight throughout the construction phase. We recommend contacting us directly for a quote tailored to your specific project.

Want to Know When to Bring a Consultant Into Your Project?

A short consulting call saves months of delays. Contact Saar Udi with your project details.

Contact & Details → saarsafety.co.il
SU

Saar Udi

Senior Fire Safety Consultant | saarsafety.co.il

Over 20 years of fire safety consulting experience, including 7 years in the Fire Protection Division of the Israel Fire and Rescue Authority in inspection and enforcement roles. Architectural background enabling spatial thinking — not just equipment checking. Lead consultant on industrial and residential projects of varied scale. Co-founder of an association for advancing fire safety in Israel.